Railway Order - Cork Line Level Crossing Project
Statutory Documents Section
Appendix 1.L Schedule of Mitigation Updated at Oral Hearing 28.09.22
Application Form
- SID Application Cover Letter
- SID Application Form
- NTA Consent for Railway Order Application
- Appendix-1A of Planning Application Form
- Appendix-1B Overall List of Figures
- Appendix-1C EIA Portal Confirmation Notice Portal ID 2021088
- Appendix-1D List of Owners Occupiers Notice Date
- Cover Letter to ABP
Consultation
Notification
- Corkman 06.05.21
- Irish Rail RAI153_Cork Line Level Crossing - The Corkman 31.03.22
- Irish Examiner 06.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Examiner 31.03.22.
- Irish Independent 1 06.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Irish Independent 30.03.22 (Left page)
- Irish Independent 2 06.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Irish Independent 30.03.22 (Right page)
- Limerick Leader 08.5.21
- Irish Rail Cork Level Crossing - Print notice PDF - Limerick Leader 31.03.22
- Limerick Post 08.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Limerick Post
- Weekly Observer Notice 05.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Weekly Obsserver 30.03.22
- Vale Star Notice 06.05.21
- Irish Rail RAI153_Cork Line Level Crossing - Vale Star 31.03.22
Railway Order
- Cork Level Crossing Railway Order
- Schedule 1 - Works authorised by this order
- Schedule 2 - Land which may be acquired
- Schedule 3 - Land of which temporary possesion may be taken
- Schedule 4 - PROWs to be extingiushed
- Schedule 5 - New roads which may be constructed and roads that may be altered or closed
- Schedule 6 - Explanatory notes
- Schedule 7 - Agreements
- Book of Refrence
- List of Railway Order Application Figures
Railway Order Figures
Planning Documents
Environmental Documents
Volume 4
- List of Volume 4 Figures and EIAR Chapter Figures
- Fly Sheet for Volume 4-Figures and EIAR Chapter Figures